Installation
This chapter describes how to install the CPC400 series
controller and its peripherals. Installation of the controller
involves the following procedures:
• Determining the best location for the controller
• Mounting the controller and TB50
• Power connection
• Input wiring
• Communications wiring (EIA/TIA-232 or EIA/TIA-
485)
• Output wiring
WARNING!
Risk of electric shock. Shut off power to your en-
tire process before you begin installation of the
controller.
WARNING!
The controller may fail in a 0 percent or 100 per-
cent power output state. To prevent death, per-
sonal injury, equipment damage or property
damage, install external safety shutdown devices
that operate independently from the process con-
trol equipment.